# Drone Risk Assessment and Method Statement Template

The document that gets you onto a managed site

Editable drone risk assessment and method statement template (RAMS): hazards and controls, sequence of works, flight limits and emergency arrangements.

- **Document:** 03 Risk assessment and method statement
- **In:** Drone Business Document Template Pack, EUR 29 one-off - https://canfly.io/toolkit/drone-business-documents
- **Stage of the job:** Before you fly
- **Who asks for it:** The main contractor's site manager or health and safety lead
- **Format:** Editable .docx, rebrand and reuse on unlimited client work
- **Completed example, free:** https://canfly.io/toolkit/examples/drone-rams-example

## What it is

A combined risk assessment and method statement for a drone job - the hazards you identified with the controls against each, followed by the sequence of works you will actually follow on the day. On a managed construction site it is the document you do not get past without.

It is read as an admission document rather than as paperwork, which changes how it has to be written. It names the actual site, the actual date, the people on the task and how overflight of occupied areas will be handled. Turn up with a generic hazard list and you will be refused access, which is an expensive way to discover that the document was the job.

## What is in the document

- **1. Scope of the activity** - What is being flown, where, when, and under which operating category
- **2. Personnel** - Remote pilot, any observer or marshal, and what each is responsible for
- **3. Risk assessment** - Hazards, who is affected, controls, and the residual rating
- **4. Method statement** - The sequence of works, in the order it happens on the day
- **5. Flight limits** - The conditions and boundaries you will not exceed, written down in advance
- **6. Emergency arrangements** - Fly-away, loss of link, injury, and who is called in what order
- **7. Acknowledgement** - Signed by the pilot and countersigned on site

## When it is used

Days before you go anywhere near the site, to the main contractor's site manager or health and safety lead, alongside your insurance and credentials. It is submitted for review and sometimes challenged, so allow time for a question. RAMS is the term used in the UK and Ireland; elsewhere in Europe the same document is simply a written risk assessment and method statement, and it is asked for just as often.

## What the client does with it

A site manager uses it to decide whether to let you on site, and to brief their own people on what will be overhead and when. Once accepted it becomes part of the site file, which means it is the version of your operation that gets looked at if anything happens. The hazards section is far easier to fill in honestly if you photographed each one on the recce first.

## What it is not

It is an operational document, not a permit and not legal advice. It does not grant an authorisation, replace your operator registration, or decide which operating category your flight falls into - confirm anything regulatory with your national aviation authority.

## Questions

### Is RAMS the same as a risk assessment?

RAMS is the UK and Ireland term for the two documents issued together: the risk assessment that identifies what can go wrong, and the method statement that says how the work will be done safely. Elsewhere in Europe the same pair is asked for under plainer names. The template covers both, in the order a site reviews them.

### Do I need one if my authorisation does not require it?

Those are two separate questions. What your national authority requires of you is theirs to state. Site access is the one that stops jobs: a principal contractor on a managed site will ask for a written risk assessment and method statement before letting you through the gate, whatever category you fly in, and usually days in advance.

### Will a generic template be accepted?

Not for long. A site manager reads it looking for the specifics of their site - the access route, the exclusion area, who holds the cordon, what happens on a lost link. The template makes those fields you fill in rather than prose you compose, but the content still has to be about the actual job.

## Documents used alongside it

- **Site Survey and Access Record Template for Drone Operations** - The recce, written down so the rest almost writes itself. https://canfly.io/toolkit/templates/site-survey-access-record-template
- **Drone Occurrence and Incident Report Template** - Filled in before you need it, not during. https://canfly.io/toolkit/templates/drone-occurrence-report-template
- **Drone Survey Scope of Works Template** - Agree what the job is before you price it. https://canfly.io/toolkit/templates/drone-scope-of-works-template

These are our own documents. They contain no national zone data and none is required to use them. The canfly? map, the zone data and every export remain free.

---

**Citing this page:** canfly?, “Drone Risk Assessment and Method Statement Template”, https://canfly.io/toolkit/templates/drone-risk-assessment-method-statement-template.
canfly? aggregates the official UAS geographical zones that EU and EEA states publish under
Regulation (EU) 2019/947, Article 15. It is not an air-traffic or flight-authorisation service;
critical flights must be confirmed against the national authority.