The defect schedule, as something you can filter and close out
The defect schedule as a spreadsheet, for operators who track jobs in one. Nine columns: reference, location, finding, grade, recommended action, evidence file, the date raised with the client, status and the date closed.
Grade and status are dropdowns rather than free text - S1 to S4 and NA, and Open, In progress, Referred or Closed - so a register filled in across twenty jobs can still be filtered. The header row is frozen with a filter applied, the grade cells are colour-coded, and the sheet is set up to print in landscape on one page width.
Section by section, as it ships.
| Ref and Location | The same references the report uses, so the two documents reconcile |
| Finding and Grade | The observation, and the grade from the severity scale, as a dropdown |
| Recommended action | What should happen, in the words the report uses |
| Evidence | The image filename, so a row can be checked against a photograph |
| Raised with client and Status | The date it was raised, and an Open to Closed dropdown |
| Closed | The date it was signed off, which is what turns the register into a record |
Alongside the report rather than instead of it. The report is the deliverable; the register is how a defect gets tracked after the report has been read and filed. On recurring work it is the more useful of the two, because it is the only artefact that survives from one visit to the next.
A facilities team works the register rather than the PDF: filter to S1 and S2, work down the list, set each row to Closed with a date. Because the references and the evidence filenames match the report, an auditor can go from a closed row back to the photograph that raised it. That audit trail is the reason to hand over both, and it is a reasonable thing to charge for on a maintenance contract.
It is a register, not a maintenance management system. It holds no costs, no programme and no asset hierarchy, and it is deliberately a flat sheet so it can be pasted into whatever system the client already runs.
The schedule is a snapshot: what was found on the day, fixed in the issued document. The register is the live list, with status, owner and dates, carried from one visit to the next. On recurring work it is the only artefact that survives, and it is often why a client keeps you rather than retendering.
Either, and it is worth settling before you issue the first one. Operators who keep it tend to win the next inspection, because the register is what the renewal conversation happens over.
Yes - it is a plain spreadsheet with no macros, so it opens and keeps its structure wherever you work. The validation lists for grade and status are the only thing that may need re-applying after a conversion.
The rest of the job, in the order it happens.
One grading scheme, meaning the same thing every time
Drone Inspection Report Template PackThe report a building owner can actually act on
Drone Inspection Report Template PackWhat you delivered, and what needs attention first
Drone Business Document Template Pack