The paperwork a paying job asks for, in the order it gets asked for
Last reviewed 2026-11-18
Three groups of paperwork, and only one of them is regulated.
Only the first group is regulated. The second and third are commercial: nobody issues them to you and nobody audits them, which is why they are the first thing to slip - and why a competent operator with no paperwork still reads as a hobbyist with a drone. They are also where the money is decided, because they are the only part of the job the client ever sees.
Under Regulation (EU) 2019/947 the shape of this is the same across the EU and EEA, and the detail is national. At the altitude worth stating here, a commercial operation holds four things.
Which of those applies to your aircraft, your site and your flight profile is a question for your national authority, and it is the one question on this page we will not answer for you. What we can tell you, free and dated, is where the zones are: the coverage page lists every EU and EEA state we hold data for, and each country page names the authority that publishes it.
This is the group that stops jobs. A principal contractor on a managed site will ask for paperwork before they let you through the gate, and they will ask days ahead, whatever category you fly in. None of it is issued to you - you write it, and the first time you write it is always the time you do not have.
The fourth thing asked for at the gate is proof of insurance and your credentials. A checklist for assembling that pack ships with the business document pack, but there is deliberately no page about it on this site and no guidance here on cover levels: what you are required to hold, and what a given client considers enough, is a per-state and per-contract question we are not in a position to evidence. Ask your authority and your broker.
The deliverable is the product. A client who commissioned a survey judges the whole job by the document that lands, and on most jobs the only two sections read end to end are the executive summary and the schedule of findings.
Two documents sit underneath all of those. A defect severity scale, decided once and then left alone, is what makes a grade in a roof survey mean the same thing as a grade in a thermal survey. A defect register is the live list that carries from one visit to the next, and on recurring work it is the artefact that keeps you on the job. A client handover note closes the delivery, and an occurrence report is the one you want written before the day you need it.
In the order a job needs them, with the page about each one. The stage is when it is written, not when it is filed - a risk assessment written the night before is a risk assessment nobody read.
| Once, up front | |
|---|---|
| Defect Severity Scale Template | You - and then every client who reads a grade in one of your reports |
| Before you quote | |
| Drone Survey Scope of Works Template | The client, before a price exists |
| Before you fly | |
| Drone Risk Assessment and Method Statement Template | The main contractor's site manager or health and safety lead |
| Site Survey and Access Record Template for Drone Operations | You - and the risk assessment you are about to write from it |
| After the flight | |
| Drone Roof Inspection Report Template | The building owner or managing agent who commissioned the survey |
| Solar PV Thermal Inspection Report Template | The operations and maintenance contractor or asset manager who will act on it |
| Construction Progress Report Template for Drone Surveys | The quantity surveyor and the client's project manager |
| Storm Damage Inspection Report Template for Insurance Claims | The loss adjuster or the broker handling the claim |
| Asset Inspection Report Template | The owner, managing agent or structural engineer deciding whether to pay for access |
| Defect Register Template in Excel | Whoever tracks a defect to closure - usually a facilities or maintenance team |
| Client Handover Note Template | The client, alongside the deliverable |
| If something goes wrong | |
| Drone Occurrence and Incident Report Template | Your national authority, your insurer, and your own records |
Four documents cover it: a scope of works so the price matches the job, a written risk assessment and method statement so you can get on site, one report template for the discipline you actually sell, and a severity scale so the grades in that report mean something. The rest can wait until the work recurs.
That is the order they are needed in, not the order they are easiest to write. The report is the one operators build first, because it is the one they can picture - and the risk assessment is the one that decides whether they get to fly at all.
What insurance cover you need and at what level, whether your particular flight needs an operational authorisation, and how your own national authority wants any of it evidenced. Those are per-state questions with real consequences for getting them wrong, and we are not in a position to evidence an answer - so we do not publish one. Ask your authority, and your broker.
What we do publish, free and dated, is the zone data itself: every EU and EEA state we hold is on the coverage page, each country page names the authority that publishes it, and the export guide covers getting the zones onto a controller. None of that requires buying anything.
Your authorisation requirements are set by your national authority and are a separate question. Site access is the one that stops jobs: a principal contractor on a managed site will ask for a written risk assessment and method statement before granting access, whatever category you fly in, and they usually want it several days ahead.
RAMS is the UK and Ireland term for the two documents issued together - the risk assessment that identifies what can go wrong, and the method statement that says how the work will be done safely. Elsewhere in Europe the same pair is asked for under plainer names, and just as often.
Operating for money, you will be asked for proof of cover by nearly every client and every managed site, and a number of states require it outright. What the minimum is, and whether it applies to your aircraft, is set per state - ask your authority or your broker. We publish no guidance on cover levels, deliberately.
No. Compliance is registration, competency, authorisation where it is needed, and flying inside the rules - all of it issued and checked by your national authority. Documents are how you win work, get on site and get paid for it. The two are often confused, and anyone selling you the first as the second is selling you something they cannot deliver.
They are in English and written against EU and EEA practice, with the UK and Ireland term RAMS noted where it applies. Nothing in them is state-specific, which is what lets them cross borders - and is also why they cannot tell you what your own authority requires of you.
No. A scope of works, a risk assessment and method statement, one report template and a severity scale will carry a first paying job. Add the register when the work recurs and the handover note when you start being asked what you are keeping.
No, and nobody can. Registration, competency and operational authorisations come from your national authority. We sell editable documents for the commercial side of the work, and we publish the official zone data free, for every state we cover.
The documents themselves
Editable Word and Excel templates for everything above, in two packs. One-time payment, free updates, and two completed examples readable without an email.