The document that gets you onto a managed site
A combined risk assessment and method statement for a drone job - the hazards you identified with the controls against each, followed by the sequence of works you will actually follow on the day. On a managed construction site it is the document you do not get past without.
It is read as an admission document rather than as paperwork, which changes how it has to be written. It names the actual site, the actual date, the people on the task and how overflight of occupied areas will be handled. Turn up with a generic hazard list and you will be refused access, which is an expensive way to discover that the document was the job.
Section by section, as it ships.
| 1. Scope of the activity | What is being flown, where, when, and under which operating category |
| 2. Personnel | Remote pilot, any observer or marshal, and what each is responsible for |
| 3. Risk assessment | Hazards, who is affected, controls, and the residual rating |
| 4. Method statement | The sequence of works, in the order it happens on the day |
| 5. Flight limits | The conditions and boundaries you will not exceed, written down in advance |
| 6. Emergency arrangements | Fly-away, loss of link, injury, and who is called in what order |
| 7. Acknowledgement | Signed by the pilot and countersigned on site |
Days before you go anywhere near the site, to the main contractor's site manager or health and safety lead, alongside your insurance and credentials. It is submitted for review and sometimes challenged, so allow time for a question. RAMS is the term used in the UK and Ireland; elsewhere in Europe the same document is simply a written risk assessment and method statement, and it is asked for just as often.
A site manager uses it to decide whether to let you on site, and to brief their own people on what will be overhead and when. Once accepted it becomes part of the site file, which means it is the version of your operation that gets looked at if anything happens. The hazards section is far easier to fill in honestly if you photographed each one on the recce first.
It is an operational document, not a permit and not legal advice. It does not grant an authorisation, replace your operator registration, or decide which operating category your flight falls into - confirm anything regulatory with your national aviation authority.
RAMS is the UK and Ireland term for the two documents issued together: the risk assessment that identifies what can go wrong, and the method statement that says how the work will be done safely. Elsewhere in Europe the same pair is asked for under plainer names. The template covers both, in the order a site reviews them.
Those are two separate questions. What your national authority requires of you is theirs to state. Site access is the one that stops jobs: a principal contractor on a managed site will ask for a written risk assessment and method statement before letting you through the gate, whatever category you fly in, and usually days in advance.
Not for long. A site manager reads it looking for the specifics of their site - the access route, the exclusion area, who holds the cordon, what happens on a lost link. The template makes those fields you fill in rather than prose you compose, but the content still has to be about the actual job.
The rest of the job, in the order it happens.
The recce, written down so the rest almost writes itself
Drone Business Document Template PackFilled in before you need it, not during
Drone Business Document Template PackAgree what the job is before you price it
Drone Business Document Template Pack