The recce, written down so the rest almost writes itself
The record of the recce. Airspace status and where it was checked, take-off and landing options, access and permissions, the hazards on site and what each one means for the flight, and the environmental conditions that will decide the time of day you fly.
It is the cheapest document in the pack to fill in and the one that saves the most time downstream, because everything in the hazards table becomes a line in the risk assessment and method statement. Photograph each hazard on the recce and the method statement is largely written. The airspace row records the source and the date you checked, which is what makes the check evidence rather than a claim.
Section by section, as it ships.
| 1. Airspace | Zone status, limits, the source consulted and the date it was checked |
| 2. Access and take-off | Where you can launch and land, and whose permission that needs |
| 3. Hazards | Each hazard, where it is, and its effect on the flight |
| 4. Environment | Prevailing wind and where it funnels, sun and shadow by elevation |
| 5. Conclusion | Whether the job is flyable as scoped, and what has to change if not |
Between winning the job and writing the risk assessment - and, where the site is far enough away to make a wasted visit expensive, as much of it as possible remotely before you travel. The airspace check is the part that can be done from a desk; the wind, the shadow and the parked cars cannot.
A client rarely reads this one, and that is fine - it is a working document. Where it does go out, it goes out attached to a risk assessment on a managed site, because a site manager reading a hazard table that names their actual site can see the operation has been thought about. The conclusion is the commercially useful line: it is where you say the job needs a marshal, a road closure, or an authorisation, while there is still time to price it.
The airspace row records what a source said on a date. It is not a clearance, and zone data can lag the official record, so a critical flight is still confirmed against the national authority before it happens.
No - it is what you write the risk assessment from. The site survey records what is actually there: access, ground conditions, overhead services, the public, takeoff and landing options and the airspace picture. The risk assessment is the judgement you then make about it.
The airspace check, the aerial imagery, the ownership and the approach. The wind at the building, the shadow at the hour you will fly and the parked cars cannot, so the template separates what you established remotely from what you confirmed on site - which matters when someone asks how you knew.
It has the field, and asks you to record what you checked, when, and what it said. The zone data itself is free on this site, by country and by city, and a dated export filed with the record is what turns “I checked” into something you can show.
The rest of the job, in the order it happens.
The document that gets you onto a managed site
Drone Business Document Template PackAgree what the job is before you price it
Drone Business Document Template PackFilled in before you need it, not during
Drone Business Document Template Pack