For the asset that justifies a scaffold, or avoids one
The adaptable report in the pack, written for assets that do not have a template of their own: chimneys and stacks, facades, bridges, silos, cranes, towers. It states overall condition for the asset's age and exposure, then records findings element by element.
The work is in defining your elements before you start writing and keeping them consistent between visits - cap, flue, brickwork, banding and base for a chimney; each elevation by floor for a facade. Consistent elements are what let a second inspection a year later be compared against the first instead of read on its own.
Section by section, as it ships.
| 1. Executive summary | Overall condition for the asset's age and exposure, and the finding counts |
| 2. Scope | Exactly which elevations and elements were inspected, and from what range |
| 3. Limitations | No contact, nothing opened or removed, no testing, and what that excludes |
| 4. Method and conditions | Aircraft, sensor, operating category, clearances and conditions |
| 5. Findings | By element, each graded, with a table of what could not be assessed and how to |
| 6. Defect schedule | Reference, element, finding, grade and recommended action |
| 7. Recommended actions | Banded by urgency, naming what aerial imagery cannot resolve |
| Appendix A - Image index | Element, view and range for each image, against its finding |
To whoever has to decide whether to spend money on access - an owner, a managing agent, or the structural engineer they have retained. This is usually the document that justifies a scaffold or avoids one, so it is read closely and sometimes adversarially, and it should be written in the expectation that it will be.
The Not assessable table is the part that gets acted on first: it tells the client which elements still need a mobile platform or a rope access team, and what each would cost them to resolve. Where the report finds nothing urgent, it has saved the price of an access hire, and stating condition against the asset's age is what makes that finding credible rather than convenient.
It is a visual aerial survey, so it cannot report on structural adequacy, material condition below the surface, or flue integrity on a chimney. The template says so explicitly, because a reader who assumes otherwise will assume it in writing.
Anything surveyed externally and non-intrusively where the question is whether to spend money on access: facades, chimneys and stacks, towers and masts, tanks, bridges and industrial structures. The sections do not assume a building, which is what makes it the one to reach for when a job does not match a discipline-specific template.
Because it usually is. This is the document that justifies a scaffold or a rope access team, or avoids one, so it is read by someone with a budget decision riding on it. The limitations and Not assessable sections are what keep an honest survey from being read as a clean bill of health.
No. It is the document that says whether a close-up inspection is warranted and where. Saying so explicitly is what protects you when the scaffold goes up and finds something the survey could never have seen.
The rest of the job, in the order it happens.
The report a building owner can actually act on
Drone Inspection Report Template PackOne grading scheme, meaning the same thing every time
Drone Inspection Report Template PackAnomalies tied to a string, not a thermal image in a folder
Drone Inspection Report Template Pack